Bathroom Renovations in Lawrence Park
renoWOW! has been renovating Toronto bathrooms since 1993, with a fixed price agreed before work starts and a two-year workmanship warranty once we leave. If you’re planning a bathroom renovation in Lawrence Park, one in-house team handles demolition, plumbing, electrical, waterproofing, tiling, and finishing, so your project isn’t waiting on outside trades to show up. Call 866-352-1251 for a free in-home consultation.
Bathrooms We Build in Lawrence Park
A Lawrence Park bathroom renovation gets the same in-house team from demolition to final walkthrough. No trade is ever waiting on another to show up.
Full Bathroom Remodels
Everything out to the studs and rebuilt properly, including anything the original build got wrong. Typically 3 to 4 weeks, starting from $15,000.
Walk-in Showers
Curbless and low-curb showers with frameless glass, built on a proper sloped bed and waterproof membrane. Tub-to-shower conversions run 2 to 4 weeks, starting from $6,000.
Vanity & Storage Solutions
Custom vanities, floating cabinets, and storage solutions built to make the most of the room.
Flooring & Tile Installation
Porcelain, stone, and large-format tile, with in-floor heating available on any build.
4-Step Bathroom Renovation Process
01 Free Consultation
We walk the bathroom with you, talk through what’s realistic for the space and the budget, then put a written scope and a fixed price in front of you before anything is signed.
02 Design & Material Selection
Tile, vanity, fixtures, and glass are chosen from suppliers we trust and ordered before demolition starts.
03 Build
Dust barriers up, floors protected, and the same crew on site through the whole build.
04 Walkthrough & Warranty
We go through every detail with you before calling it done, and back the work with a two-year workmanship warranty in writing.
Bathroom Renovations for Every Lawrence Park Home
Older, prewar-era homes
Cast iron stacks, lath and plaster, and a second-floor bathroom sitting on joists sized for a different era are all common in older Toronto homes. We check the structure before promising a freestanding tub.
Postwar and mid-century homes
Usually a tight four-piece with no fan and a window instead. The win here is often the layout.
Condo bathrooms
Board approval, insurance certificates, and elevator booking all need to be sorted before the first tile goes down.
Basement bathrooms
Adding one below grade usually means breaking concrete, or an up-flush system if the drain sits too high. Both need a permit.
Get Started With a Free Bathroom Renovation Estimate
Begin your Lawrence Park bathroom renovation with a free estimate from renoWOW!. We assess your space, listen to your ideas, and provide a clear and accurate quote to guide your renovation project.
Choose renoWOW! As the Leading Bathroom Contractor in Lawrence Park
With over 32 years of experience, renoWOW! is a trusted bathroom renovation company in Lawrence Park. We offer flexible renovation solutions from minor upgrades to full master bathroom renovations, supported by professional planning and quality installation.
Our team is committed to customer satisfaction, reliable timelines, and competitive pricing. Call 866-352-1251 today and explore our recent projects to experience the renoWOW! difference.
Other Areas We Serve Near Lawrence Park
In addition to Lawrence Park, renoWOW! renovates bathrooms across Leaside, Rosedale, Forest Hill, and North York.
What Our Client Say
Bathroom Renovation FAQs for Lawrence Park
How much does a bathroom renovation cost in Lawrence Park?
Pricing depends on scope more than location. A powder room refresh typically runs $6,000 to $12,000. A standard three-piece bathroom in the same layout is $15,000 to $25,000. Moving plumbing or changing the layout puts a full renovation at $25,000 to $40,000, and a primary ensuite runs $25,000 to $45,000. Labour is the biggest line on any quote, since even a small bathroom needs a plumber, an electrician, a tiler, and a finisher. We hold back 10 to 15 percent as a contingency for older homes, where opening the walls can reveal a rusted cast iron stack or a subfloor that’s been quietly getting wet, and we tell you before we spend it.
How long does a bathroom renovation take?
A standard bathroom in the same layout usually takes 3 to 4 weeks. Moving plumbing or opening walls extends that to 6 to 8 weeks, and a custom spa-style build can run 8 to 12 weeks. Vanities, shower glass, and specialty tile are usually what holds a job up, which is why materials are ordered before demolition starts rather than during the build.
Do I need a permit for a bathroom renovation in Toronto?
Swapping a tub, vanity, or toilet in the same spot generally doesn’t need one. You do need a permit once you move plumbing, add a new bathroom, or cut into structure, issued by Toronto Building under the Ontario Building Code. Condos are separate again, since your building’s board will want its own approval package regardless of what the city requires. renoWOW! sorts out which permits apply to your project and handles the paperwork.